Thursday, August 31, 2017

Rebuilding the utility room - part 3

Cross a couple more items off the list. The utility room floor is tiled and grouted. That took about 3 days, including the time it took to empty the room again. Tiling always seem like something that should go pretty quick, but it doesn’t. Laying the tiles at a 45 degree angle means that all the tiles near the wall need to have corners cut off and small corners need to be cut to fit between them. Unless you happen to start in the corner, special care is needed to get the proper cuts to fit in a corner. Even when just laying out a row, it takes time to back butter and align each tile. The thinset is mixed in batches, about 6 batches for this small room. Sometimes, the thinset drys out and needs to be re-mixed. It does go much faster with two people.

For the utility room we’re using the same color of tile as the kitchen/bath, but using smaller 12×12 tiles. While easier to deal with when cutting, the smaller tiles do present more challenges getting them aligned. It is even worse when one box has tiles that are slightly larger than the previous couple of boxes. 1/8th inch grout lines don’t leave much wiggle room when the tiles are a 1/16th inch bigger. Yeah, I’m whining or making excuses because I’m not real happy with the way it turned out. It’s usable and I think the really bad spots will be covered but still…

With the floor done, trim work can start. The door casing was finished and turned out good. I definitely like working with wood better than tile. The inside window trim was cut, primed, painted and installed. Now all the window needs is casing and a window shade. One piece of casing shy of being able to finish it off.
IMG_4758.JPG

While the utility room work took place inside, the outside of the cabin was prepped and stained with SuperDeck Mission Brown stain. We hired someone to do the staining as that’s one messy job and not being afraid to get up high on a ladder is pretty much a requirement. If it wasn’t still surrounded by an ugly rotting deck, the cabin would look pretty good with the fresh coat of stain.
IMG_4762.JPG

Todo list
Utility Room

  1. Fix ant infested ceiling joist
  2. Get roof fixed/replaced
  3. Replace electrical boxes
  4. Add recessed lighting
  5. Figure out washing machine drain
  6. Replace dryer vent
  7. Frame new closet
  8. Seal up the room
  9. New insulation
  10. New drywall
  11. Texture drywall
  12. Paint walls and ceiling
  13. Prep for tile floor
  14. Tile floor
  15. Grout floor
  16. Window and door trim
  17. Base boards

Monday, August 14, 2017

The utility bedroom

Progress on the utility room continues and is actually going according to schedule! Although, keeping on schedule has been more work than anticipated at times. The goals for the past weekend were paint and cement board. The primer coat went pretty quick but did take almost 3 gallons of paint. After that was done, we only had a small break (lunch) and it was time to start putting some color on the ceiling and walls. I had forgotten how much work it is doing all the hand work for the ceiling to wall corners. This room had some interesting challenges in that the ceiling in most areas isn’t high enough to stand on the platform without hitting my head, but just high enough to make it a reach without the platform. This also makes it fun when using a roller, with a long handle, you’re baning into things, and without, you’re stretching. Another small break while the ceiling drys before trying to cut in for the walls.
IMG_4633_595.jpg

We’ve not had good luck getting the wall paint to cover in one coat. It almost does, but leaves lots of spots where it seems to pull away or shrink as it dries. With a second coat on the wall, we call it done.

Next we install the cement board on the floor. Getting it cut and placed isn’t too bad, but then we have to screw it all down. That’s a lot of screws!
IMG_4642_595.jpg

Some thinset on the all the seams and it should be ready for tile. But that’s going to have to wait. We need the guest bedroom back as a bedroom so eunwieldlyverything has to be moved back into the utility room. We do spend some time trying to organize it a little so it’s not a complete mess. The cardboard floor covering in the bedroom has served it’s purpose and was looking pretty bad, so we pulled that up and finally get to see what the room really looks like now.
IMG_4647_595.jpg

Since most of the rooms have been completed, it was time to start working on a way to show the dramatic changes that the have taken place over the past 4 years. One of the ideas was to duplicate many of the original photographs and show before and after photos for each room. There are still a couple of room missing, but the results are available from the menu on the right. This also prompted a review of the main website for the cabin photos. Using the photo gallery for the main web pages and menu is getting a little unwieldy and there have been some issues with the photo gallery in general; like the thumbnails don’t look very nice and it doesn’t work well when viewed on a mobile browser. After reviewing a number of different photo gallery packages for the web, there are two that seem to work best. One is a revamp of the existing code. The thumbnails are cleaned up and the photos properly set to display with the right orientation on all browsers. The second is a fairly complex database driven package. While the complexity of using it is higher, it does offer some nice features like display of the camera info and the ability to allow comments to be posted for the photos. Both versions are available from the menu on the right. To finalize this, a new main cabin web page needs to be created. One thought is to use is blog as the main page and use the menu on the right to access all the different sub sections. If you have any thoughts on this, please leave a comment.

Todo list
Utility Room

  1. Fix ant infested ceiling joist
  2. Get roof fixed/replaced
  3. Replace electrical boxes
  4. Add recessed lighting
  5. Figure out washing machine drain
  6. Replace dryer vent
  7. Frame new closet
  8. Seal up the room
  9. New insulation
  10. New drywall
  11. Texture drywall
  12. Paint walls and ceiling
  13. Prep for tile floor
  14. Tile floor
  15. Grout floor
  16. Window and door trim
  17. Base boards