Remodel pictures of downstairs main bathroom
-
Checking upstairs toilet drain - looks OK
-
-
Starting bathroom demolition
-
Genny works on the fiberglass panels
-
Pulling down the fiberglass panels
-
-
More rotten wood (and ants)
-
The sheetrock is coming off
-
-
This sheetrock is pissing me off
-
Surprise! Looks like the room next door was once a utility room
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Bob works on adding a niche
-
Bob works on adding a niche
-
-
-
-
Ripping up old vinyl floor
-
-
-
-
Outlet, light, fan, light (and thermostat)
-
Power for the heated floor
-
The new fan/light is smaller than the old one
-
-
Hope this is where the switch goes
-
-
-
Hmm, those cuts could be a bit straighter.
-
Genny prepares to sand the ceiling
-
-
That'll smooth things out!
-
Removing old bathroom window
-
Removing old bathroom window
-
-
-
-
-
-
-
Up comes the particle board sub-floor
-
-
Out with the old door frame
-
-
-
-
-
-
-
Test fit of tub and vanity
-
Test fit of tub and vanity
-
-
-
Old steel water lines are going bye bye.
-
-
Getting new tub/shower valve ready
-
-
-
We have water and drains again
-
installing greenboard in bathroom
-
installing greenboard in bathroom
-
installing greenboard in bathroom
-
bathroom greenboard looking good
-
bathroom greenboard looking good
-
-
-
-
-
-
-
Iced Latte in the bathroom
-
-
-
-
-
-
-
-
-
almost done with hardiboard
-
-
-
-
-
-
Starting to look like something
-
Cutting out opening for tub / show control
-
-
-
-
-
-
-
Almost looks like we know what we're doing
-
Almost lines up (damn unlevel level)
-
-
Tub surround about half way done.
-
tile redo (damn unlevel level)
-
Alignment is much better now
-
-
-
Starting the decorative boarder
-
-
End of day 3 (or is it 4) of tiling
-
The niche is looking pretty good
-
-
-
-
-
Tub tiling done (except for grout)
-
Tub tiling done (except for grout)
-
Tub tiling done (except for grout)
-
Tub tiling done (except for grout)
-
Selfie with new mirror and light
-
-
-
Grouting the tub surround
-
Grouting the tub surround
-
Grouting the tub surround
-
-
-
Grouting the tub surround
-
-
-
Laying out the heat mat on the floor
-
-
Make sure the wires are ready to feed to the box
-
-
-
New shower and tub fixures installed
-
Cutting a tile for the tolet hole
-
Tile layout in the bathroom
-
Tile layout in the bathroom
-
-
-
Thingset in the bathroom (part 2)
-
The bathroom is almost tiled
-
-
Larry having fun grouting bathroom tile
-
Finishing up the bathroom tile grout
-
Genny happily cleaning grout from tile
-
Getting ready to install a toilet
-
-
-
-
-
-
-
Bolt it down (and realize you don't have the right water ling)
-
Drilling holes for the shower curtain
-
We have a shower curtain rod
-
-
Bathroom is finished except baseboards, oh and a door
-
More bathroom glamour shots
-
Looks like a real bathroom now
-
More bling in the bathroom, towel bar and towel hooks installed.
-
-
-
-
-
Bob's happy with the door
-
Genny painting the bathroom door
-
Bathroom toe kick installed
-
Adding some baseboard in the bathroom
-
Genny paints behind the toilet
-
-
Bathroom wall art, notice how the decorations bring out the colors of the shower curtain.
-
-
-