Remodel pictures of upstairs bathroom
-
Removing the old crusty valve
-
New vanity cabinet and new valves
-
-
New vanity in the upstairs bath
-
New vanity in the upstairs bath
-
New vanity in the upstairs bath
-
Ripping out partical board subfloor.
-
Can 3/8" partical board really be considered subfloor for a bathroom?
-
Bathroom ceiling removed. Vaulted bathroom ceiling anyone?
-
-
-
Removing studs to make way for new door opening
-
-
-
Am I still trying to get that stud out?
-
Removing the last of the original wall
-
Looking through the new door at the new wall
-
-
New bathroom door openning framed
-
Old bathroom door opening to be framed in
-
From the bathroom, looking at the re-designed door / wall
-
From the bathroom, looking at the back of the new wall
-
First piece of sheetrock in the bathroom
-
Working our way around the bathroom
-
We've rocked two wall now
-
Unlike the previous owners, we're leaving the ceiling wide open
-
Bob fits drywall in the bathroom
-
Making sure the niche is not covered
-
Larry tapes and muds the bathroom
-
Larry measures cement board for bathroom floor
-
-
-
-
Starting to dry-fit tiles
-
Cutting a notch for the water line
-
Dry-fitting tiles for bathroom
-
-
Let's start placing some tiles!
-
-
Bathroom is looking tiled
-
-
Genny is the backbuttering queen
-
-
Grout and toilet installed
-
-
-
-
-
-
-
Tile back-splash and mirror
-
Preparing backsplash for grout
-
-
-
Wiping down the grout on the backsplash
-
Wiping down the grout on the backsplash
-
Remote light switch for bathroom
-
-
-
-