Bob & Genny's Cabin | Clipper Mills
Remodel pictures of the utility room
-
-
-
-
That's what a placed dryer looks like
-
And we have a pair, now to get them hooked up
-
Utility room paneling removed. That switch will be re-located
-
Removing the old air addmitance valve
-
Cutting an opening for the new air addmitance value box
-
new air addmitance valve box installed
-
-
You can see the washer/dryer again!
-
-
-
-
-
-
-
Getting ready for demo day
-
Getting ready for demo day
-
Look what we found behind the wall
-
Demolished down to the studs
-
Demolished down to the studs
-
Demolished down to the studs
-
Ants have demolished this rafter
-
Not much left of the rafter and roof above
-
Ready to start rebuilding
-
-
-
-
Installing recessed lighting
-
-
Happy dance as insulation goes in
-
-
New desk height outlet box
-
Partial insulation, gaps sealed with foam, closet framing
-
Firing around pocket door
-
Partial insulation and updated electrical
-
-
-
-
-
New roof board and no more hole
-
-
-
sticky back rubber membrane
-
-
-
-
-
-
-
-
-
Running electrical to new recessed lights
-
How does this thing go together?
-
-
-
-
-
Cut out the openings for the recessed lights
-
Cutting drywall for the last bit of ceiling
-
-
This was the most difficult wall...
-
Cutting the opening for a light switch
-
-
Finished hanging drywall - 1
-
Finished hanging drywall - 2
-
Finished hanging drywall - 3
-
Finished hanging drywall - 4
-
-
-
-
Yeah, this stuff stays on the ceiling because, you know, gravity
-
Working on the second coat
-
Style is everything when working with joint compound
-
-
Smoothing out another corner
-
-
Cutting cardboard to cover the window
-
-
-
-
-
-
-
-
-
-
Cutting in the wall color
-
Cutting in the wall color
-
-
-
-
-
-
-
-
-
-
-
Initial layout to get started laying tile in utility room
-
Let's get the tile party started...
-
-
-
-
-
-
-
-
The middle goes faster because of less cutting
-
-
-
-
-
-
-
-
Baseboards installed and door painted
-
Genny works on painting the outside of the door
-
Genny works on painting the outside of the door
-
Genny works on painting the outside of the door
-
Finally, some color on an outside door, Genny's happy
-
Utility room window trim installed
-
Adding door alignment blocks to the pocket door
-
Adding door alignment blocks to the pocket door
-
New washer drain plumbing
-
Washer & dryer re-installed and ready for use
-
Tools moved back into utility room
-
Ready for cabinet install
-
Setting a level ledger board to place the uppers
-
First upper cabinet going up
-
-
Second upper cabinet installed
-
Third upper cabinet installed
-
Final upper cabinet installed
-
-
Working on fully supporting the knee drawer and counter corner
-
-
Desk being preped for countertop
-
-
Installing the countertop
-
-