March 8th 2014
More framing for fireplace.
Installed niche shelf in bathroom
March 15th 2014
Finish up framing for fireplace
March 26th 2014
Electrical runs for TV above fireplace and controls for blower into back bedroom.
Friday, February 28, 2014
TEST (historical February 2014)
February 8th 2014
It was raining. Found water around bathroom/bedroom wall. Opened up wall and some of bedroom ceiling. Water was coming from vent pipe that was in place for original washer/dryer location. Previously, this was routed through the floor but parts were removed when working on the bathroom. Cutting and capping the vent pipe fixes the leak.
February 17th 2014
Work on framing for fireplace.
Friday, January 31, 2014
TEST (historical January 2014)
January 25th 2014
Installed mirror in bathroom.