Saturday, November 30, 2013
TEST (historical November 2013)
November 2nd 2013
Start framing new wall for fireplace and built-in bookcase
November 9th, 10th 2013
Frame new wall separating living area from kitchen to hide fridge from living area. Sheetrock the new wall and blend it in with the existing kitchen walls.
Install upper molding on kitchen cabinets.
November 17th 2013
Work on framing for fireplace.
November 23rd, 24th 2013
Load up laminate flooring into trailer for trip up to cabin. Move it all to the upstairs bedroom.
Install the microwave in the kitchen.